Overcoming the Impossible: Our Team's Triumph in a Challenging Packaging Facility Project

Our exceptional team effortlessly tackled a challenging project that initially seemed near impossible.

When approached by a longstanding customer to install a new filler within their bustling packaging facility, we faced the additional challenge of minimising production downtime on existing lines. 

Through collaborative brainstorming and meticulous planning, together we devised a solution: constructing a scaffolding bridge to facilitate skating and ensuring the smooth transition of the 17-ton machine over the packaging hall while sourcing suitable mobile lifting equipment able to fit into the tight environment while providing the strength to lift the machine on and off the ‘sky bridge’.

This project exemplifies the dedication and professionalism of our teams, showcasing our ability to overcome complexity with ingenuity and teamwork.